Caring for three treasured, listed buildings for future generations.
Designed to improve and maintain these treasured listed buildings for future generations, here's what we've completed and what's still to come at each of our churches.
Completed: roof repair following the May 2019 lead theft, tower clock restoration, a new church-to-hall path, a new churchyard path from Westhorpe Road to Church Street, and broadband installation.
Ongoing / planned: a new low-energy heating system (fundraising in progress), stained-glass porch repair (quotes obtained from Lincolnshire Stained Glass Studios), replacement of the hall flooring (laid in 1995/6), replacement of the stone floor (survey complete), a new hall kitchen, a survey and repair of the stained glass windows, and a new south pew platform to match the north.
Completed: a new water main and south aisle roof.
Planned: a kitchen and disabled toilet inside the church (plans approved, awaiting permissions and grants), full rewiring, new underfloor electric heating, and a sound system.
Completed: a full interior redecoration and the restoration of the "Clough Angels" to golden glory — work featured on the BBC's The Repair Shop — plus tree clearance to improve visibility.
Planned: exterior cleaning, painting and timber treatment, with grants being sought; work is anticipated in 2026.
Debbie Reynolds, Parish Administrator — 07803 875638